You don't have javascript enabled. Good luck with that.
Pencarian
Kereta LRT Jakarta Diuji Coba Dari Stasiun Velodrome ke Stasiun Boulevard

LRT Trialled from Velodrome Station towards Kelapa Gading

This trial is done twice in a day, precisely first trip at 3-4 PM and second trip at 4-5 PM

PT Light Rail Transit (LRT) Jakarta today is conducting an operation trial of four LRT train cars. Operation trial is carried out from the Velodrome station to the North Boulevard station.

Jakarta LRT Train Tested Operating

Besides him, there were also PT Jakarta Propertindo (Jakpro) President Director, Dwi Wahyu Darwoto; President Director of PT LRT Jakarta, Allan Tandiono; and Head of Jakarta Transportation Dept., Andri Yansyah.

"This trial is conducted to ensure the train is running well and of course on time," expressed Allan Tandiono, President Director of PT LRT Jakarta, Wednesday (9/12).

He explained that the limited trial time from Rawamangun Velodrome station to Kelapa Gading LRT station is in accordance with the trip time planning, which is 12 minutes.

Similarly, central operational control has been running well.

"The train runs at a speed of 15 kilometers per hour when turning and speed of 40 kilometers per hour when running straight," he stated.

Linked News
Popular News indeks
  1. Open for All: Jakarta City Hall Welcomes Visitors for Namu Balai Kota

    access_time03-10-2026 remove_red_eye762 personDessy Suciati
  2. Transjakarta Reaffirms Ban on Busking in Mikrotrans and Bus Stops

    access_time02-10-2026 remove_red_eye550 personAldi Geri Lumban Tobing
  3. 1,500 Runners and Pets Hit the Track for World Rabies Day Run 2026

    access_time03-10-2026 remove_red_eye548 personAnita Karyati
  4. Commission D Supports Reserve Fund for Long-Term Infrastructure

    access_time02-10-2026 remove_red_eye526 personFakhrizal Fakhri
  5. Jakarta Logs 0.13% Inflation as Chicken, Chili, and Rice Push Prices Up

    access_time03-10-2026 remove_red_eye510 personFakhrizal Fakhri